A selection of completed work organized by core service — Grouting, Coatings, and Specialty Structural. Every project executed within outage constraints, with zero compromises on quality.
Full project narratives — the problem, the scope, the execution, and the measured outcome. Two completed studies are available now.
From Fire Hose to Garden Hose
A metals processing facility's acid-damaged car well was degrading operations. MIC restored 10,000 SF of concrete substrate and installed an immersion-grade novolac epoxy lining — cutting weekly washdown from 4–5 operators to one and from a half-shift down to about two hours.
When the Base Outlasts the Maintenance Cycle
A chloride-rich facility was rebuilding centrifuge foundations every major maintenance cycle. MIC installed a monolithic polymer block system with no ferrous reinforcement — eliminating the corrosion pathway. Three years in service, zero corrosion, zero maintenance events.